Publication date: 20 November 2017

Ruwini Edirisinghe, Kerry Anne London, Pushpitha Kalutara and Guillermo Aranda-Mena

Building information modelling (BIM) is increasingly being adopted during construction projects. Design and construction practices are adjusting to the new system. BIM is intended…

4506

Abstract

Purpose

Building information modelling (BIM) is increasingly being adopted during construction projects. Design and construction practices are adjusting to the new system. BIM is intended to support the entire project life-cycle: the design and construction phases, and also facility management (FM). However, BIM-enabled FM remains in its infancy and has not yet reached its full potential. The purpose of this paper is to identify major aspects of BIM in order to derive a fully BIM-enabled FM process.

Design/methodology/approach

In total, 207 papers were classified into main and subordinate research areas for quantitative analysis. These findings were then used to conceptualise a BIM-enabled FM framework grounded by innovation diffusion theory for adoption, and for determining the path of future research.

Findings

Through an extensive literature review, the paper summarises many benefits and challenges. Major aspects of BIM are identified in order to describe a BIM-enabled FM implementation process grounded by innovation diffusion theory. The major research areas of the proposed framework include: planning and guidelines; value realisation; internal leadership and knowledge; procurement; FM; specific application areas; data capture techniques; data integration; knowledge management; and legal and policy impact. Each element is detailed and is supported by literature. Finally, gaps are highlighted for investigation in future research.

Originality/value

This paper systematically classifies and evaluates the existing research, thus contributing to the achievement of the ultimate vision of BIM-enabled FM. The proposed framework informs facility managers, and the BIM-enabled FM implementation process. Further, the holistic survey identifies gaps in the body of knowledge, revealing avenues for future research.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 September 2022

Abdullahi B. Saka, Daniel W.M. Chan and Saheed O. Ajayi

Although there has been a surge in the adoption of building information modelling (BIM) in the construction industry, the small and medium-sized enterprises (SMEs) are still…

Abstract

Purpose

Although there has been a surge in the adoption of building information modelling (BIM) in the construction industry, the small and medium-sized enterprises (SMEs) are still struggling and perceive its adoption as risky. The SMEs in developing economies are especially on the disadvantaged side of the digital divide. Extant studies have focused on large firms and there are scanty studies on the influence of the external environments on BIM adoption in SMEs. Thus, this study espouses institutional theory (INT) to examine the influence of coercive, mimetic, and normative pressures on BIM awareness and adoption in SMEs.

Design/methodology/approach

A quantitative approach was employed, and data were collected from the Nigerian construction SMEs via an empirical questionnaire survey using a sequential stratified and convenient sampling method. Hypothesized relationships between the coercive, mimetic, and normative pressure and BIM in SMEs were empirically tested using the partial least squares structural equation modelling (PLS-SEM) technique and the model was validated with the “PLSpredict” procedure.

Findings

The results revealed that coercive and mimetic pressures significantly influence BIM adoption in SMEs while normative pressures have the strongest influence on BIM in SMEs. Also, BIM awareness is an important predictor of BIM adoption. The findings also shed light on the influence of firmographics on BIM awareness and adoption in Nigerian SMEs.

Originality/value

The study empirically validates the applicability of INT and highlights that BIM adoption is not only influenced by internal responses to the need for efficiency but also by external pressures. It implies a clear need for intentional isomorphic pressures in driving BIM adoption in SMEs. The study employs the INT to explain a phenomenon that has not been theoretically explored in the context of SMEs in developing economies. Lastly, the study provided valuable insights into driving BIM adoption, together with the effective practical implications for implementation and potential research areas for further studies.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 1 March 2023

Rachel Madeira Magalhães, Luiz Carlos Brasil de Brito Mello and Maria Aparecida Steinherz Hippert

The main factor that leads organizations to implement Building Information Modeling (BIM) is customer demand. While this is a frequent topic in the BIM literature, few studies…

1585

Abstract

Purpose

The main factor that leads organizations to implement Building Information Modeling (BIM) is customer demand. While this is a frequent topic in the BIM literature, few studies address BIM organizational readiness. Due to this gap in BIM implementation literature, this paper aims to understand what affects organizational BIM readiness and how the BIM readiness process occurs.

Design/methodology/approach

The present paper adopts design science research as a methodological approach. A literature review examined 69 journal articles. The analysis focused on multiple theories, such as organizational readiness for change, adoption and diffusion of innovations and project management.

Findings

By investigating BIM organizational readiness, this study presents a construct and a conceptual model for driving BIM readiness.

Originality/value

This study can benefit researchers and organizations. The results presented may drive further research and discussions on the topic. But it is important to state that these results must be tested on real situations.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 30 March 2020

Mukhtar A. Kassem, Muhamad Azry Khoiry and Noraini Hamzah

Project failure is the result of one or a combination of several causes of risk factors that are very important to identify for effective performance. This study aims to focus on…

Abstract

Purpose

Project failure is the result of one or a combination of several causes of risk factors that are very important to identify for effective performance. This study aims to focus on studying the fundamental relationship between internal risk factors and the negative effect on oil and gas project success in Yemen using the partial least square structural equation modelling (PLS-SEM) method.

Design/methodology/approach

Data collection was carried out using a formal questionnaire survey of the oil field sector in Yemen by companies involved in mega-oil and gas construction projects. A hierarchical model for determining causative internal risk factors and their effects was developed and evaluated using SEM method by SmartPLS3 software technology.

Findings

The findings of analyzing model indicate that all categories have a significant effect on project success, while the most significant affected categories in the internal risk factors are project management factors, feasibility study-design and resources-material supply with a path coefficient value of 0.213, 0.197 and 0.186, respectively. Moreover, for the hypotheses test, the positive relationship means that all experimental hypotheses are accepted according to path coefficient value analysis. In addition, the internal risk factors research model shows the ranking of effects on project success starting with project stoppage (loading factor 0.841), cost overruns (loading factor 0.818), time overruns (loading factor 0.726) and project target failure with loading factor 0.539.

Research limitations/implications

The research was limited to the oil and gas construction projects in Yemen.

Practical implications

Interpreting the relationship between internal risk factors and their impact on the success of construction projects in the oil and gas sector will assist project team and oil companies in developing risk response strategies and developing appropriate plans to mitigate the effects of risks, which is presented in this paper.

Originality/value

The paper explains the relationship between cause and effect of internal risk factors in oil and gas projects in Yemen, and is expected to be a guideline for the oil companies and future academic research in the risk management area.

Article
Publication date: 2 May 2020

Mukhtar A Kassem, Muhamad Azry Khoiry and Noraini Hamzah

Construction projects in the oil and gas sector are greatly affected by external risk factors, especially those related to the economy, politics, security and stability factors…

1215

Abstract

Purpose

Construction projects in the oil and gas sector are greatly affected by external risk factors, especially those related to the economy, politics, security and stability factors. Hence, this research aimed to investigate the fundamental relationship between the external risk factors and their effects on the construction project success using Structural Equation Modeling method and PLS-SEM approach.

Design/methodology/approach

Data collected through a structured survey distributed to projects teams in the oil and gas sectors in Yemeni companies involved in mega construction projects. A hierarchical model for assessing causative external risk factors and their effects on project success was developed and analyzed using Smart PLS 3 software of SEM.

Findings

The findings showed that economic, political, force majeure and security-related risk factors had a strong effect on project success. Besides, the Coefficient of Determination (R-squared value) equals 0.743, represented the proportion of variation in the dependent variable(s), which can be explained by one or more predictor variable. Moreover, the predictive relevance value Q2 is 0.375 above zero, which indicates that the conceptual model can predict the endogenous latent constructs. The calculated Goodness of Fit (GoF) Index of the model was 0.699, which shows that the developed model had substantial explanatory power to represent the relationship between the cause of external risk factors to and the effect on construction project success.

Research limitations/implications

This research was limited to the oil and gas construction projects in Yemen as case study.

Practical implications

Practically, this study highlights the external risk factors that cause a negative effect on the success of oil and gas construction projects in Yemen. The research model of these factors is the first step in the risk management process to develop strategic responses for risks and explain the relationship between cause and effect on project success.

Social implications

The model of external risks factors that cause the failure of construction projects helps develop response strategies for these risks, thereby increasing the chances of project success reflected in the oil and gas sector, which is a main tributary of the national economy in developing countries.

Originality/value

There is a need to improve the planning of economic and security performance as well as to mitigate political risk factors effects on project success and other risk factors discussed in this study, which effect on construction project success according to their priorities.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 August 2019

Mukhtar A. Kassem, Muhamad Azry Khoiry and Noraini Hamzah

This study aims to identify and assess the significant risks in Yemen oil and gas construction projects based on their risk rating (impact and probability) by using…

1546

Abstract

Purpose

This study aims to identify and assess the significant risks in Yemen oil and gas construction projects based on their risk rating (impact and probability) by using probability–impact matrix (PIM).

Design/methodology/approach

In total, 51 risk factors that might affect construction projects in the oil and gas sector are defined through a detailed literature review and expert judgment. The risk factors were tabulated in a questionnaire form, which was sent to a total of 400 participants asking their contribution in identifying the risk matrix for the risk factors in terms of impact and probability of occurrence during the project life cycle. Five zones were used in the matrix according to the degree of risk factor’s severity on the success of the project. These zones are light green, dark green, yellow, light red and dark red.

Findings

The PIM analysis for risk factors found that five factors are located in the dark red zone, as top risks factors have a very high impact and very high probability of occurring; 40 factors are located in the light red zone; six factors are located in the yellow zone; and no factors are located in the green zone (light and dark), which is considered an indication of the importance of risk factors under study and their impact on the success of construction projects in the oil and gas sector. Moreover, the factors under feasibility study and design and resources and material; are the most categories effect on project success.

Research limitations/implications

The research was limited to the oil and gas construction projects in Yemen.

Practical implications

Practically, this study highlights the top risk factors in oil and gas construction projects, which might cause an adverse effect on project success in Yemen. Classification and ranking of these factors by using the risk matrix provide the basis for risk response planning to enhance the chances of project success.

Originality/value

This paper identifies the matrix for risk factors affecting the success of construction projects in the oil and gas industry in Yemen. There is a significant contribution expected from this research, especially for companies operating in the oil and gas sector and other organizations that plan to invest in this field, in addition to expected benefits for the Yemeni Government and researchers because of lack of research in this area.

Details

International Journal of Energy Sector Management, vol. 14 no. 3
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 30 July 2020

Mukhtar A Kassem, Muhamad Azry Khoiry and Noraini Hamzah

The oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC) companies are…

1116

Abstract

Purpose

The oil and gas construction projects are affected negatively by the drop in oil price in recent years. Thus, most engineering, procurement and construction (EPC) companies are opting to optimize the project mainly to mitigate the source of risks in construction to achieve the project expectation. Risk factors cause a threat to the project objectives regarding time, cost and quality. It is additionally a vital component in deviating from the client's expectation of productivity, safety and standards. This research aims to investigate the causes of risk in the oil and gas construction projects in Yemen.

Design/methodology/approach

A comprehensive literature review from various sources including books, conference proceedings, the Internet project management journals and oil and gas industry journals was conducted to achieve the objectives of this study. This initial work was predicated strictly on a literature review and the judgments of experts to develop the risk factor framework for the oil and gas construction projects in Yemen.

Findings

The authors found a few studies related to risk factors in oil and gas construction projects and shared a similar view about general construction projects. However, only a fraction of the factors accepted have included the variances of other studies on a regional basis or specific countries, such as the Yemen situation, due to the differences between the general construction industry and oil and gas industry. Moreover, the factors of these attributes were still accepted due to their applicability to the oil and gas industry, and no significant variances existed between countries. Research has indicated that 51 critical factors cause risks in the oil and gas construction projects in Yemen. Such risk factors can be divided into two major groups: (1) internal risk factors, including seven critical sources of risks, namely client, contractor, consultant, feasibility study and design, tendering and contract, resources and material supply and project management; and (2) external risk factors, including six sources of critical risk factors, namely national economic, political risk, local people, environment and safety, security risk and force-majeure-related risk factors. A risk factor framework was developed to identify the critical risk factors in the oil and gas construction projects in Yemen.

Research limitations/implications

This research was limited to the oil and gas construction projects.

Practical implications

Practically, this study highlights the risk factors that cause a negative effect on the success of oil and gas construction projects in Yemen. The identification of these factors is the first step in the risk management process to develop strategic responses for risks and enhance the chances of project success.

Social implications

The identification of risks factors that cause the failure of construction projects helps develop response strategies for these risks, thereby increasing the chances of project success reflected in the oil and gas sector, which is a main tributary of the national economy in developing countries.

Originality/value

This research is the pioneer for future investigations into this vital economic sector. Given the lack of resources and studies in the field of construction projects for the Yemeni oil and gas sector, the Yemeni government, oil companies and researchers in this field are expected to benefit from the results of this study. The critical risk factors specific to the oil and gas construction projects in Yemen should be further investigated with focus only on Yemen and its oil and gas industry players.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 March 2019

Mukhtar A. Kassem, Muhamad Azry Khoiry and Noraini Hamzah

This study aims to investigate the risk factors in construction projects in oil and gas processing facilities in Yemen and serves as a case study for developing countries.

Abstract

Purpose

This study aims to investigate the risk factors in construction projects in oil and gas processing facilities in Yemen and serves as a case study for developing countries.

Design/methodology/approach

By using a questionnaire, data were collected from 201 project managers and engineers employed in different sectors in the oil and gas industry in Yemen.

Findings

The survey analysis based on Kruskal–Wallis test method shows a high degree of agreement on the perceptions of risk factors depending on categories of companies. In other words, the tested risk factors exist in all sectors of oil companies in Yemen and are valid as a measure of risk factors in construction projects in oil and gas organizations in general. Although no evidence suggests that the risk factors differ significantly according to job title, the result of identifiable risk factors according to experience shows a statistically significant difference among participants in terms of their experience. The relative importance of the ranking of risk factors was obtained by the statistical analysis of responses on the impact and likelihood of occurrence of these risks. Findings show that internal risks are the greatest influential factors in construction projects in the oil and gas sector, followed by changes during construction project, government instability, incorrect project cost estimation, government delay in decision making, incorrect project schedule estimation, and political situation and war in the country.

Originality/value

These findings are valuable to organizations that are planning to conduct construction projects for oil and gas processing facilities in Yemen and other nations with similar environments, such as developing countries.

Details

International Journal of Energy Sector Management, vol. 13 no. 4
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 7 September 2023

Himal Suranga Jayasena, Niraj Thurairajah, B.A.K.S. Perera and Mohan Siriwardena

Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of…

Abstract

Purpose

Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of understanding that supports contextualized understanding of BIM adoption decisions in a BIM infant industry. The framework bridges the gap in current knowledge in terms of the absence of such a framework, which has hindered the structured understanding of the BIM decision of an adopter, curtailing the appropriate strategizing of their BIM adoption.

Design/methodology/approach

The study focuses on a BIM infant industry, where early adopters begin using BIM, allowing insights into this crucial initial stage of adoption. Identifying affordances as a versatile concept that could effectively represent not only what an adopter perceives and expects from BIM implementation, but also, what the adopter, in fact, can achieve from it, an affordance-led framework of understanding (AFU) was developed to comprehensively capture varying dynamics of BIM decision process. The study took a qualitative retroductive approach to theory with semi-structured interviews to gather necessary data from a sample of BIM adopters purposively selected to maximize the breadth and depth of data.

Findings

The study concludes by identifying and defining pertinent affordances as a new concept and a compulsory state for BIM adoption. Findings further demonstrate that existing theories can be linked to the AFU to strategically direct the affordances dynamics towards the pertinent state.

Originality/value

The AFU enables a deeper contextualizable view of innovation adoption that was absent in existing innovation studies. It significantly enhances the precision of strategizing BIM adoption compared to previous approaches, enabling adopters to plan and implement BIM in a manner that aligns well with their expectations and specific conditions.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 20 October 2020

Abdullahi B. Saka and Daniel W.M. Chan

Despite the SMEs representing a large percentage of firms in the construction industry, there has been an under-representation of SMEs’ perspective in BIM research studies. This…

2454

Abstract

Purpose

Despite the SMEs representing a large percentage of firms in the construction industry, there has been an under-representation of SMEs’ perspective in BIM research studies. This paper aims to systematically review the few extant studies with a view of synthesizing the findings.

Design/methodology/approach

Hermeneutic philosophy using the interpretivist epistemology approach with a touch of metasynthesis was adopted to critically review and analyse extant studies published over the last decade.

Findings

The findings revealed a scarcity of BIM studies in SMEs, the status of adoption, identified barriers, benefits and drivers. A conceptual model was then developed based on the literature review and theoretical lenses of innovation diffusion model, technology–organization–environment framework and institutional theory. The paper presents pertinent propositions to drive BIM in the SMEs.

Originality/value

This paper holistically reviews extant BIM studies from the perspective of SMEs that are the backbone of the construction industry. It synthesizes extant studies and sets scenes for further studies.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 599